Get In Touch With Us

Mon-Fri from 9am to 5pm

+1 (604) 786-0938

info@davericjtech.com

Subscribe to our newsletter

115-7088 Mont Royal Square

Vancouver, BC Canada


Our Project Experience

Proven results across mining project services and custom business solutions

Project Controls • Automation

Developed and implemented a Labour and Cost Utilization System for a mining project, cutting weekly and monthly report generation from 8 hours to under 1 hour.

Labour & Cost Utilization System

Tetra Tech • Mining Project

Project Controls • Scheduling

Delivered end-to-end project controls during the execution stage of the P3 Project in Brucejack, BC, integrating Primavera P6 schedules with resource-loaded baselines.

P3 Project — Execution Controls

Pretium • Brucejack, BC

Planning • Primavera P6

Developed a resource-loaded EPPC schedule and Basis of Schedule in Primavera P6 for the Castle Mountain Gold Feasibility Study, integrating WBS engineering disciplines and baseline foundations.

Castle Mountain Gold — Feasibility Study

Equinox • California, USA

Program Planning • Primavera P6

Developed a standardized Level 3 Master Schedule in Primavera P6 for Teck’s Management Operating System, unifying WBS structures across major mining sites (RDO, HVC, QB, CDA).

Management Operating System — Master Schedule

Teck • Vancouver, BC

Benchmarking • ERP Integration

Delivered a custom Benchmarking and Estimating Application System integrated with ERP across engineering disciplines, featuring fast search and standardized import/export templates.

Benchmarking Application System

Worley Chemetics • Vancouver, BC